Amusement Park
Amusement Park
Project Description
Club Cabana, located in Bangalore, is a multipurpose leisure center that features an amusement park, water park, wave park, and various amenities such as party areas, restaurants, and a bowling alley. Given the vast array of attractions and services, the facility requires a robust management system to optimize resource consumption, enhance safety and security, and control operational costs effectively.
Project Summary
Arnowa was engaged to evaluate and enhance the operational infrastructure at Club Cabana. The project aimed to benchmark the current conditions of electrical, mechanical, safety, and security systems, providing actionable recommendations for optimizing operations and improving overall efficiency. This initiative sought to identify potential risks and propose measures for cost reduction while enhancing safety and security within the facility.
Challenges
- Inefficient Energy Management: Club Cabana faced high energy costs and potential equipment failures due to a lack of focus on energy efficiency, power quality, and preventative maintenance.
- Safety Concerns: Loose wiring, insecure electrical boards, and unrestricted access posed significant risks to guest safety.
- Inadequate Water Treatment: Manual water dosing practices risked inaccurate treatment, jeopardizing visitor health.
- Maintenance Practices: The shift from reactive maintenance to predictive maintenance was crucial for ensuring the longevity and reliability of equipment.
Objective
To provide a comprehensive evaluation of Club Cabana’s operational infrastructure, ensuring optimal resource consumption, enhanced safety and security, and improved cost-efficiency through smart management solutions.
Solutions
- Comprehensive Documentation: Implementing a system for site diagrams, wiring layouts, and equipment manuals to streamline maintenance and future upgrades.
- Smart Metering: Installing smart meters to monitor energy usage in real-time, enabling identification of energy-saving opportunities and justifying cost reductions.
- Enhanced Security: Upgrading to high-resolution, PTZ, wireless digital CCTV cameras to improve visitor safety and incident capture.
- Automated Water Management: Transitioning pump stations to automated water quality monitoring and dosing for consistent health and safety assurance for all guests.
Results
- The implementation of smart metering and documentation practices resulted in significant cost savings and improved operational efficiency.
- Enhanced security measures led to a safer environment for guests, with clear incident capture capabilities.
- Automated water management systems ensured reliable health and safety standards, elevating visitor experience.
Overall, the project aligned with Arnowa’s commitment to optimizing resource management and enhancing facility operations.
EXECUTIVE SUMMARY
Location
- Club Cabana, Bangalore, India
Challenge
- High energy costs and inefficient energy management
- Safety risks due to loose wiring and insecure electrical systems
- Inconsistent water treatment jeopardizing visitor health
- Reactive maintenance practices leading to equipment reliability issues
Metering Hardware
- Smart meters for real-time energy monitoring
- Automated water quality monitoring and dosing systems
- High-resolution PTZ wireless digital CCTV cameras for enhanced security
Results
- Significant cost savings through energy optimization and smart metering
- Improved safety with upgraded security systems and reliable incident capture
- Consistent health and safety standards via automated water management
- Enhanced operational efficiency in line with Arnowa’s resource management goals